Akbar, Saeed and Zubair, Muhammad and Khan, Rizwan and Akbar, Ubaid Ul and Ullah, Rahmat and Zheng, Zhonglong (2024) Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach. IEEE Access, 12. pp. 29824-29836. DOI https://doi.org/10.1109/access.2024.3350440
Akbar, Saeed and Zubair, Muhammad and Khan, Rizwan and Akbar, Ubaid Ul and Ullah, Rahmat and Zheng, Zhonglong (2024) Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach. IEEE Access, 12. pp. 29824-29836. DOI https://doi.org/10.1109/access.2024.3350440
Akbar, Saeed and Zubair, Muhammad and Khan, Rizwan and Akbar, Ubaid Ul and Ullah, Rahmat and Zheng, Zhonglong (2024) Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach. IEEE Access, 12. pp. 29824-29836. DOI https://doi.org/10.1109/access.2024.3350440
Abstract
This study addresses the Weighted Multi-Skill Resource Constrained Project Scheduling Problem (W-MSRCSPSP) with the aim of minimizing software project makespan. Unlike previous works, our investigation regards heterogeneous resources characterized by varying skill proficiency levels. Another major problem with existing methodologies is the potential underutilization of human resources due to varying task durations. This work introduces an innovative scheduling approach known as the Greedy and Parallel Scheduling (GPS) algorithm to handle the said issues. GPS focuses on assigning the most suitable resources available to project activities at each scheduling point. The fundamental goal of our proposed approach is to reduce resource wastage while efficiently allocating surplus resources, if any, to project tasks, ultimately leading to a decrease in the makespan. To empirically evaluate the efficacy of the GPS algorithm, we conduct a comparative analysis against the Parallel Scheduling Scheme (PSS). The advantage of our proposed approach lies in its ability to optimize the utilization of available resources, resulting in accelerated project completion. Results from extensive simulations substantiate this claim, demonstrating that the GPS scheme outperforms the PSS approach in minimizing project duration.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Greedy and Parallel Scheduling; Heterogeneous skill proficiency; Parallel Scheduling Scheme; Project scheduling; Resource assignment; Weighted multi-skilled resources |
Divisions: | Faculty of Science and Health Faculty of Science and Health > Computer Science and Electronic Engineering, School of |
SWORD Depositor: | Unnamed user with email elements@essex.ac.uk |
Depositing User: | Unnamed user with email elements@essex.ac.uk |
Date Deposited: | 24 Jan 2024 12:17 |
Last Modified: | 30 Oct 2024 21:30 |
URI: | http://repository.essex.ac.uk/id/eprint/37516 |
Available files
Filename: Weighted_Multi-Skill_Resource_Constrained_Project_Scheduling_A_Greedy_and_Parallel_Scheduling_Approach.pdf
Licence: Creative Commons: Attribution 4.0